News

Harte Gold Announces Positive Feasibility Study Results for Expansion to 1,200 tpd

January 20, 2021

Expansion to increase average annual gold production to nearly 100 koz at AISC of US$1,025/oz.

Toronto – January 20, 2021 - HARTE GOLD CORP. (“Harte Gold” or the “Company”) (TSX: HRT / OTC: HRTFF / Frankfurt: H4O) is pleased to report that the Company is proceeding with an expansion of its 100% owned Sugar Zone mining operation located in Ontario, Canada, from a capacity of 800 tonnes per day (“tpd”) to 1,200 tpd, based on the positive results of the Feasibility Study.

All references to non-IFRS measures are denoted and discussed at the end of the news release. All dollar amounts are in Canadian dollars unless otherwise noted. The life of mine (“LOM”) is nine years (2021 – 2029).